Construction
How will people get access to their homes and land during construction?
Access to peoples’ houses and land on the other side of a floodway (like the floodway being proposed as part of Option 1C) will be maintained throughout the construction of that option.
Access to peoples’ houses and land on the other side of a floodway (like the floodway being proposed as part of Option 1C) will be maintained throughout the construction of that option.
If a floodway is excavated, how will groundwater be managed?
An excavated floodway will have drains in it to lower the ground water and direct this ground water to the river. These drains would be similar to the drains currently in the North Clyde paddocks.
An excavated floodway will have drains in it to lower the ground water and direct this ground water to the river. These drains would be similar to the drains currently in the North Clyde paddocks.
When is construction expected to start?
Provided the deadlines associated with business case can be met, Government funding is confirmed, and consents and land access are secured, flood mitigation construction works are expected to commence in the summer 2025-2026 construction period.
Provided the deadlines associated with business case can be met, Government funding is confirmed, and consents and land access are secured, flood mitigation construction works are expected to commence in the summer 2025-2026 construction period.
When is construction expected to be completed?
Works are expected to take two summer construction seasons to be completed. Provided construction commences as expected in the summer 2025-2026 construction period, this would mean works are expected to be completed by the end of the 2026-2027 construction season.
Works are expected to take two summer construction seasons to be completed. Provided construction commences as expected in the summer 2025-2026 construction period, this would mean works are expected to be completed by the end of the 2026-2027 construction season.